Get Construction Manual M 41-01.02 PDF

By WSDOT

Show description

Read Online or Download Construction Manual M 41-01.02 PDF

Similar construction books

Download PDF by Frédérique Six: The Trouble With Trust: The Dynamics of Interpersonal Trust

The difficulty with belief poses the query: if belief is taken into account to be vital for profitable cooperation, why don’t high-trust paintings relationships predominate? a part of the reason, the writer argues, is that it truly is fairly tricky to construct and keep belief in paintings kinfolk. This ebook addresses this challenge via delivering an in-depth, multi-level empirical research of the method in which belief builds up and breaks down within the interplay among humans inside of organisations.

Download e-book for iPad: Construction Adjudication by John Riches, Christopher Dancaster

Adjudication has been the most technique of settling building disputes because it was once first brought through the Housing offers, building and Regeneration Act 1996, and a considerable physique of case legislation has now outfitted up. This e-book tested itself because the key authority on adjudication while it used to be first released.

Get Connecting Girls and Science: Constructivism, Feminism, and PDF

Connecting ladies and technology indicates readers the robust effects which may happen in secondary technological know-how school rooms whilst scholars' curiosity and interest approximately technology are introduced firmly to the guts of the curriculum. specifically, writer Elaine Howes demonstrates how ladies can turn into extra drawn to studying technological know-how whilst such issues as being pregnant, childbirth, or sexism in technological know-how are incorporated in lecture room discussions.

Extra info for Construction Manual M 41-01.02

Example text

If neither party does so, then unit prices will apply to the entire measured quantity of the item. Neither of these actions would be a change to the contract, as the provisions already allow a price change. A formal change order document might well be initiated to show the agreement, however, and would be the mechanism to create new prices. If a negotiation is initiated, the provision calls for a new price for the quantity in excess of the 25% overrun or a contract price adjustment to compensate for costs and losses associated with an excessive underrun.

3 of this manual. 4A Construction Contracts Information System (CCIS) Chapter 1 Prime Contractor D/M/WBE type if applicable Prime Contractor ethnic code if applicable Date of Statement of Intent to Pay Wages - Prime Date of Contractor and Subcontractor/Agent Cert. A. Projects Date of Affidavit of Wages Paid - Prime Date of Preconstruction Meeting Minutes Date time started Date work started Date Orig. Progress Schedule approved Date Last Supplemental Progress Schedule approved (if applicable) Date of Substantial Completion (if no Substantial Completion granted, use Physical Completion date) Date of Physical Completion Final Estimate to Contractor Date of Completion Final Estimate to Headquarters (filled in by Region office) Contract time – Original Authorized Working Days B.

Traffic Control Plans should not only address all work zones and standard devices and signs but should also address issues such as: • Conflicting or temporary pavement markings • Maintaining existing operational signs and covering conflicting signs • Staging requirements • Temporary vertical or lateral clearance restrictions • Temporary work zone illumination • Consistency with any existing work hour restrictions • Position of positive barriers for traffic hazards or worker protection • Vertical drop-offs • Work zone access • Intersection or access control (traffic signals, road approaches) • Pedestrians and bicycles • Work zone capacity and related mobility impacts If the Contractor’s method of operation or the work area conditions require other than minor modification of the specific TCP appearing in the contract or any of the TCP’s previously designated and adopted by the Contractor, the Contractor shall submit a proposed modification of the TCP for approval.